Erection Instruction
First and foremost! Prepare some tools and hire workers for the erection.If you need,we’ll make a list for you.
اس کے علاوہ,engineer’s instruction or construction team can be arranged as your request.
Erection Steps:
1. Foundation
Foundation design and construction are important to the assembly process. To ensure optimum integrity of your new building, the foundation must meet certain design criteria and load conditions. It is required that all building foundations be designed by an experienced foundation engineer, and coordinated with all local city, county and state codes. This engineer may also provide recommendations on excavation, drainage, formwork, reinforcing steel, and concrete proportioning.
2. Assemble steel structures
(7) Install Gutters, Downspouts and Rake Trim
(8) Field Locate Walk Doors and Windows